Disposal Solutions, Okemah, Oklahoma

The Disposal Solutions facility in Okemah was built in 2012 and our scope of work included design consulting and complete construction/project management as a turnkey project from raw, unimproved land to the completed facility at full operational status.
This facility features a closed loop system from truck off-load points through oil skim and separation, one (1) mile of underground transfer pipeline, secondary skim and eventual disposal into a well specifically drilled for this purpose. Additionally, it features computer controls and automated monitoring systems, a facilities building designed for 24/7 operations, safe night operations, all weather access, and heavy truck rated.
This facility features a closed loop system from truck off-load points through oil skim and separation, one (1) mile of underground transfer pipeline, secondary skim and eventual disposal into a well specifically drilled for this purpose. Additionally, it features computer controls and automated monitoring systems, a facilities building designed for 24/7 operations, safe night operations, all weather access, and heavy truck rated.